Follow our active residential projects through different construction stages:
The Grand Crest Villa
Residential Construction
Current Stage: Superstructure RCC columns and first-floor slab casting completed. Masonry wall construction and conduit chasing underway. Rigorous slump test and cube compressive strength tests verified.
ENQUIRE ABOUT SIMILAR PROJECTPalm Grove Residence
Independent Residential Home
Current Stage: Masonry completed, concealed electrical boxes and plumbing pressure tests certified. Internal wall button marking completed and sponge plastering in progress.
ENQUIRE ABOUT SIMILAR PROJECTCompleted Projects
Explore homes and buildings completed with pride by GS Construction:
Aura Haven Contemporary Residence
Luxury Turnkey Residence
Project Overview: Designed and executed with a focus on contemporary ventilation, Italian marble flooring, zero-leakage waterproof terraces, and energy-efficient UPVC fenestrations. Handed over on schedule with full compliance documents.
REQUEST TOUR OR ESTIMATESerenity Heights Residence
Independent Family Villa
Project Overview: Built from a vacant plot to handover in 9.5 months. High-strength RCC structure, custom solid wood main door, granite stairs, and comprehensive rainwater harvesting integrated.
REQUEST TOUR OR ESTIMATEMore Than a Gallery: Hidden Construction Stages
We believe photographs of hidden construction stages are just as important as photographs of the finished building. See the workmanship behind every wall and slab:
Foundation & Footings
Excavation depth check, PCC compaction, and footing reinforcement spacing verification before concrete pour.
Reinforcement & Steel Binding
Fe550D TMT bar fabrication, proper overlap lengths, and cover block placement for corrosion resistance.
RCC Frame & Shuttering
Beam and slab rebar checks, cover blocks placement, and vibrator compaction for dense, honeycomb-free concrete.
Masonry & Wall Plumb
Horizontal line check, vertical plumb verification, full mortar joint filling, and RCC lintel bands over all openings.
Electrical & Plumbing
Pressure-tested CPVC pipes and heavy conduit routing embedded before plastering to avoid later wall hacking.
Waterproofing & Ponding
Sub-floor waterproof coating with full 48-hour standing water ponding test to certify 100% leak-proof performance.
Plastering & Curing
Mesh at RCC joints to stop cracks, plumb button levels, and full curing to ensure strong surface bonding.
Flooring Alignment
Screed slope checks, laser alignment for zero lippage, and durable epoxy joint grouting.
Delivered Turnkey Home
Every hidden activity comes together to deliver a safe, functional, and durable family home.